In the following list you will find information about projects that were created or implemented in the last parliamentary term with our contribution. For many of these projects, the work of our candidates was essential to the successful completion of the project.

 

Completion of a new kindergarten, stage II 

realizationsubsidy

Garden of the new kindergarten 

realizationsubsidy

Extension of the primary school by two classrooms in the attic 

  • from the idea, study, project, preparation of the tender to the implementation
  • 9 months from project initiation to opening 9/23
  • 1.4 million in funding received CZK
  • Two new classrooms ready for our children
realizationsubsidystudy

Mailroom 

  • design and implementation of the mailroom including the interior
realization

Public lighting 

  • commissioning and cooperation on the passporting of public lighting
  • a project to reconstruct and replace all lights in all parts of the village with energy-saving LEDs
  • obtaining a subsidy of 3.78 million CZK for the first stage of the reconstruction
  • preparation of a public tender with the winning bid for 5.16M, implementation spring 2024
  • submission of an application for Phase II with a subsidy of 1.2M - public tender and implementation spring-summer 2024
  • after completion of the renovation, energy savings of up to 90%, programmed 50% attenuation from 23.00 to 5.00
  • energy-saving measures on existing LED lights (locations Centre, Na Pískách, ...), power reduction to 50% = switching on all LED lights
  • replacement of faulty HV cabling in Kozolupy
realizationsubsidyinvestment

Walking and cycling route from Kuchař to VÚ 

  • restoration of the old 1.2 km long municipal road to a paved dirt road
  • autumn 2023 implementation of Phase I
  • completion of the entire road in spring 2024
  • we also plan to install baskets, benches and landscaping around the ravine
  • 1,4 million subsidy received CZK
  • Photo gallery from the autumn preparation of the new path here
realization

Energy savings 

  • fitting the primary school with new thermostatic heads with blocked temperature (saving at least 10% of heat)
  • replacement of the boiler in the municipal office and in the municipal building in Kozolupy with a condensing boiler, more efficient control (energy savings of 20 %)
  • installation of LED lights throughout the primary school
realizationinvestment

Security 

  • installation of the guardrails at the new kindergarten
  • installation of bollards along the castle wall
  • installation of a traffic mirror at the exit from Na Nouzově Street
realization

Repair of roads 

  • Kuchař - K Viaduktu Street - surface reconstruction using recyclates
  • VÚ connection between U Kamene and V Chaloupkách streets - surface reconstruction using recycled material
realizationinvestment

Communication projects 

  • documentation of the actual condition - Communication in the vicinity of the Vysoký Újezd Municipal Office
  • documentation of the actual condition - Kozolupy - basis for the project of ul. Ke Kameňáku and Ve Vinici
  • cooperation on the K Loužce street reconstruction project
  • commissioning a project for the construction of new pavements along regional roads
studyinvestment

Technical services 

  • award and preparation of a public tender for the selection of a maintenance company (MK Greenery)
  • selection and purchase of a new truck and other equipment
realization

Purchase of land for civic amenities 

  • long-term negotiations with the selling party
  • purchase contract for the price of 500 CZK/m2, total area of more than 37 thousand m2
  • in the new zoning plan change of the land from arable land to construction of OV, will allow the construction of the 2nd level of primary school, multipurpose hall, outdoor sports field, restaurant, collection yard, TS facilities, fire station, possibility of commercial civil construction - home with social care, sports, ..
  • See what land the municipality has acquired
realizationinvestment

Kozolupy Community Centre 

study

Community space in Kuchař 

  • repair of the dykes, creation of a seating area with a pier and a pontoon
  • safe crossing of the road to the pub
study

Extension of the primary school - New pavilion 

  • studys and design for building permit and contractor selection
  • extension with 4 classrooms, cloakrooms, classrooms, assembly room
  • connection through a corridor to the existing building
  • extension of the dining room and kitchen
  • complete 1st stage (2x5 classrooms)
  • building permit spring 2024
  • The project study can be viewed on the community website.
studyinvestment

Zoning study of the settlement greenery 

study

Project for the planting of insulating greenery 

study

New zoning plan 

  • cooperation with the processor and the purchaser
  • negotiations with state administration authorities
  • finalisation of the proposal for public consultation
realizationstudy